ABII NATIONAL SAVINGS & LOAN LIMITED
Description

ABii National is a Savings and Loans Company in Ghana that provides financial service to the general public. Its headquarters house Priority Insurance and Atinka Media Village, two of their subsidiaries. Concerns over rising energy bills pushed ABii National to think about a sustainable and cheaper energy source, therefore approaching Wilkins Engineering to help actualize their goals.

Wilkins Engineering Installed a 60kWp Solar PV system using the Jinko Poly crystalline modules and 2 units of the SMA STP 25KVA string inverter which generates about 86.7MWh of energy per year.

LOCATION:
AVENOR, GREATER ACCRA REGION

CUSTOMER:
Abii NATIONAL SAVINGS AND LOANS

OUR ROLE:
MAIN CONTRACTORS

PROJECT SCOPE:
ENGINEERING, SUPPLY AND CONSTRUCTION OF A GRID CONNECTED SOLAR SYSTEM

DATE:
FEBRUARY 2018

OVERVIEW:
PEAK PV POWER: 60 kWp
NOMINAL AC POWER OF PV INVERTER: 50KVA
ANTICIPATED ANNUAL ENERGY OUTPUT: 75MWH

Details
Location: AVENOR, GREATER ACCRA REGION, GHANA
Surface Area: 60kWp
Year: 2018
Value:
Categories: 2018, Solar,

© 2022 Wilkins Engineering Limited | All Rights Reserved.

Website Design by Spesuna

ABii National is a Savings and Loans Company in Ghana that provides financial service to the general public. Its headquarters house Priority Insurance and Atinka Media Village, two of their subsidiaries. Concerns over rising energy bills pushed ABii National to think about a sustainable and cheaper energy source, therefore approaching Wilkins Engineering to help actualize their goals.

Wilkins Engineering Installed a 60kWp Solar PV system using the Jinko Poly crystalline modules and 2 units of the SMA STP 25KVA string inverter which generates about 86.7MWh of energy per year.

LOCATION:
AVENOR, GREATER ACCRA REGION

CUSTOMER:
Abii NATIONAL SAVINGS AND LOANS

OUR ROLE:
MAIN CONTRACTORS

PROJECT SCOPE:
ENGINEERING, SUPPLY AND CONSTRUCTION OF A GRID CONNECTED SOLAR SYSTEM

DATE:
FEBRUARY 2018

OVERVIEW:
PEAK PV POWER: 60 kWp
NOMINAL AC POWER OF PV INVERTER: 50KVA
ANTICIPATED ANNUAL ENERGY OUTPUT: 75MWH