To mitigate climate change, the Australian Embassy in Ghana embarked on a project to embrace solar energy as its primary source. Wilkins was tasked to install a 85.73kWp connected to a 144kWh battery bank using Jinko Solar Modules, SMA STP String Inverter, SMA Sunny Islands, and Ritar Gel Batteries. The project delivers with an estimated annual energy output of 73.6MWh

LOCATION:
ACCRA, GREATER ACCRA REGION

CUSTOMER:
AUSTRALIAN HIGH COMMISSION

OUR ROLE:
MAIN CONTRACTORS

PROJECT SCOPE:
ENGINEERING, SUPPLY AND CONSTRUCTION OF A HYBRID SOLAR PV SYSTEM

DATE:
DECEMBER, 2017

OVERVIEW:
PEAK PV POWER: 85.73 kWp
NOMINAL AC POWER OF PV INVERTER: 50KW
BATTERY CAPACITY: 144kWh

Details
Location: Accra, Ghana
Surface Area: 85.73kWp
Year: 2017
Value:
Categories: 2017, Solar,

© 2022 Wilkins Engineering Limited | All Rights Reserved.

Website Design by Spesuna

To mitigate climate change, the Australian Embassy in Ghana embarked on a project to embrace solar energy as its primary source. Wilkins was tasked to install a 85.73kWp connected to a 144kWh battery bank using Jinko Solar Modules, SMA STP String Inverter, SMA Sunny Islands, and Ritar Gel Batteries. The project delivers with an estimated annual energy output of 73.6MWh

LOCATION:
ACCRA, GREATER ACCRA REGION

CUSTOMER:
AUSTRALIAN HIGH COMMISSION

OUR ROLE:
MAIN CONTRACTORS

PROJECT SCOPE:
ENGINEERING, SUPPLY AND CONSTRUCTION OF A HYBRID SOLAR PV SYSTEM

DATE:
DECEMBER, 2017

OVERVIEW:
PEAK PV POWER: 85.73 kWp
NOMINAL AC POWER OF PV INVERTER: 50KW